Services / Utility interconnection and net metering applications

Utility interconnection application

We fill out and file the utility interconnection (and net metering / export) application for solar, battery and generator jobs, using your plan set, then track it until the utility gives permission to operate. Utility fees are billed back at cost.

For: Solar and battery installers, electricians adding storage or generators. US, Canada, Australia and UK.

What you get

  • Completed utility application (and net metering / export agreement)
  • One-line and site plan formatted to the utility's rules
  • Equipment certification list (UL 1741 / IEEE 1547, CSA C22.2 No. 107.1, AS/NZS 4777 or G98/G99, by country)
  • Customer signature packet (e-sign where the utility allows)
  • Status tracking until permission to operate

Usually within 2 business days of getting everything we need. Rush is available. One round of changes from the permit office or utility is included.

Price

Interconnection applicationNEEDS BRIAN'S PRICE
Rush, add-onNEEDS BRIAN'S PRICE

Permit, utility and engineer fees are not included. If your job needs an engineer's stamp, we confirm the cost and timing before we start.

What we'll ask for

  • Electric utility / distribution network operator
  • Utility account number (or NMI / MPAN)
  • Meter number
  • Application type
  • Inverter nameplate, kW AC
  • Inverter make, model and quantity
  • Export
  • Customer email for the utility's e-signature

The order form only asks the questions that apply to your job.

What to upload

  • Plan set or one-line diagram
  • Recent utility bill (page with account and meter number)

Helpful if you have them:

  • Inverter / battery spec sheets
  • Signed customer authorization (if you already have it)

Drawn to your local rules

We draw to the code edition your permit office uses and look up its local requirements first.

United States

Your utility's interconnection and net metering / net billing application, IEEE 1547 and UL 1741 equipment, export limits.

Canada

Your LDC or utility's micro-generation / net metering application under provincial rules, CSA C22.3 No. 9 and C22.2 No. 107.1 equipment.

Australia

Your DNSP's connection application, AS/NZS 4777.2 inverters from the approved list, export limits.

United Kingdom

ENA G98 notifications and G99 applications to your DNO, G100 export limitation.

Questions

Do you submit it for us?

We prepare the full packet ready to submit. Ask us about submitting it on your behalf.

How long does the utility take?

That's up to the utility. We prepare the packet within our turnaround. Utility review time is extra.

Other services