How it works
The short version: you send us a good site survey, we send you a plan set you can submit. Here's the longer version.
- Create your company account.
It takes a couple of minutes. Everyone on your team can log in and see the same jobs. - Add the project.
Fill in the job details and upload the survey photos and your layout. The form walks you through it, and it works on a phone, so whoever does the site visit can fill it in on the roof. - Submit the order.
Tick rush if you need it the next business day. If a required photo is missing, we'll ask for it right away rather than guess. - We draw it.
If we have a question, it shows up in the project chat and you get a notice. Answering quickly keeps the job moving. - Download the plan set.
It lands in your dashboard, usually within 2 business days of us having everything we need. - Revisions.
If the AHJ or utility comes back with comments, send them through the project and we'll update the drawings. One round of those is included.
What we need from you
- Site address and homeowner name
- Your sales design or panel layout, with the number of modules on each roof face
- Module, inverter, racking and attachment models
- Main panel bus and breaker rating, and how you want to interconnect (load-side breaker, supply-side tap, derate, or meter collar)
- Roof details: stories, number of layers, framing type and span
- Battery and backup details, if the job has them
- Anything special: HOA rules, existing equipment, a needed-by date
Photo checklist
Clear, well-lit photos save a round of questions.
- Utility meter, with the meter number readable
- Main panel label (the sticker with the bus and main breaker ratings)
- The wall where the equipment will go
- Front of the house
- Attic framing, with a tape measure across the rafters
- Each roof face that will get panels
- Subpanel, if there is one